CAMheads CNC Router Forum By: CAMaster CNC

Go Back   CAMheads CNC Router Forum By: CAMaster CNC > Software > General Discussion

Reply
 
Thread Tools Display Modes
  #1  
Old 09-09-2020, 04:30 PM
UglySign UglySign is offline
CAMhead Legend
 
Join Date: Mar 2014
Posts: 108
Default Start / Stop Misting between cuts

For a misting setup (Unist)

With the Mist action enabled....
is it possible for the misting unit to pause between cuts in WinCNC?

So as the spindle lowers to cut, the mister activates/sprays.
When the cut is finished, the mister deactivates or pauses.
The cycle continues for each cut.

Is it possible?
Reply With Quote
  #2  
Old 09-10-2020, 06:48 AM
Steve Burke Steve Burke is offline
CAMaster Owner
 
Join Date: Jun 2017
Location: Bonaire, Georgia
Posts: 60
Default

If it's controlled by the cnc you could add M codes to controll it.
M07 turns it on
M09 turns it off
__________________
Stinger 1 SR-23
Windows 10
Vectric VCarve Pro
3.5 Milwaukee router
Prepped for recoil
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:41 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2020, Jelsoft Enterprises Ltd.