CAMheads CNC Router Forum By: CAMaster CNC

Go Back   CAMheads CNC Router Forum By: CAMaster CNC > CAMaster Machines > Elite Series

Reply
 
Thread Tools Display Modes
  #31  
Old 10-03-2018, 10:29 AM
Tristan Tristan is offline
CAMaster Owner
 
Join Date: Jul 2013
Location: KZN, South Africa
Posts: 144
Send a message via Skype™ to Tristan
Default

Unfortunately Spraying/Varnishing is a long process. The spraying itself can be quick, but the drying needs to happen properly, and that takes time. Then the varnish needs to be a high gloss varnish, then its just a few coats with de-nibbing between coats. In terms of the solar setup, that is purely to save on electricity costs, it can also be heated with electrical heaters. The tunnel only speeds up the drying time. We also use a catalyst to speed up the drying time, but each coat still takes an hour to dry.
__________________
Tristan Brammer

CAMaster Cobra CR-609 ATC
2018 CAMaster Elite CR-609 ATC

WINCNC
Enroute 4 and Aspire v8 Design Software
AutoCAD, Autosketch, Sketchup

Razor CNC
Mach3
Aspire v8

"Sawdust means Work in Progress"
Reply With Quote
  #32  
Old 10-05-2018, 08:53 PM
Rlee1972 Rlee1972 is offline
CAMaster Owner
 
Join Date: Mar 2017
Posts: 461
Default

Thank you for sharing so much info Tristan. Hope life and work are going well for you over there!
__________________
Ron Lee
Blackshear, Ga
2018 Cobra Elite 5 x 10
HSD 12HP ATC
20 Tool Holder
25HP Regen Vac

2017 Panther 408
HSD 5HP ATC
6 Tool Rotary Carousel
Recoil Lathe
Laser
Aspire 9.0
PhotoVcarve



Be humble.
Be kind.
Be grateful.
Life is too short and prone to quickly change to live otherwise.
Reply With Quote
Reply

Tags
elite

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:22 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.